Asset - Liability Management ( ALM ) System - ಆರ್ಬಿಐ - Reserve Bank of India
Asset - Liability Management ( ALM ) System
February 10, 1999 BP.BC. 8/21.04.098/99 To All Scheduled Commercial Banks Dear Sir, Asset - Liability Management ( ALM ) System Please refer to our circular DBOD No. BP. BC. 94/ 21. 04. 098/ 98 dated September 10, 1998 forwarding therewith draft Guidelines for putting in place Asset-Liability Management (ALM) System in banks. The draft Guidelines have been reviewed by us in the light of the issues raised/suggestions made by banks in the seminars held at Bankers Training College and also at the Review Meeting of the Chairmen/Chief Executive Officers of banks. The final Guidelines revised on the basis of the feedback received from banks are enclosed, for implementation by banks, effective April 1, 1999. In this connection, we have to advise as under: 2. Banks should give adequate attention to putting in place an effective ALM System. Banks should set up an internal Asset-Liability Committee (ALCO), headed by the CEO/CMD or the ED. The Management Committee or any specific Committee of the Board should oversee the implementation of the system and review its functioning periodically. 3. Keeping in view the level of computerisation and the current MIS in banks, adoption of a uniform ALM System for all banks may not be feasible. The final guidelines have been formulated to serve as a benchmark for those banks which lack a formal ALM System. Banks which have already adopted more sophisticated systems may continue their existing systems but they should ensure to fine-tune their current information and reporting system so as to be in line with the ALM System suggested in the Guidelines. Other banks should examine their existing MIS and arrange to have an information system to meet the prescriptions of the new ALM System. To begin with, banks should ensure coverage of at least 60% of their liabilities and assets. As for the remaining 40% of their assets and liabilities, banks may include the position based on their estimates. It is necessary that banks set targets in the interim, for covering 100 per cent of their business by April 1, 2000. The MIS would need to ensure that such minimum information/data consistent in quality and coverage is captured and once the ALM System stabilises and banks gain experience, they must be in a position to switch over to more sophisticated techniques like Duration Gap Analysis, Simulation and Value at Risk for interest rate risk management.
4. In order to capture the maturity structure of the cash inflows and outflows, the Statement of Structural Liquidity (Annexure-I) should be prepared, to start with, as on the last reporting Friday of March/June/ September/December and put up to ALCO/Top Management within a month from the close of the last reporting Friday. It is the intention to make the reporting system on a fortnightly basis by April 1, 2000. The Statement of Structural Liquidity should be placed before the bank’s Board in the next meeting. It would also be necessary to take into account the rupee inflows and outflows on account of previously contracted forex transactions (swaps, forwards, etc). Tolerance levels for various maturities may be fixed by the bank’s Top Management depending on the bank’s asset - liability profile, extent of stable deposit base, the nature of cash flows, etc. In respect of mismatches in cash flows for the 1-14 days bucket and 15-28 days bucket, it should be the endeavour of the bank’s management to keep the cash flow mismatches at the minimum levels. To start with, the mismatches (negative gap) during 1-14 days and 15-28 days in normal course may not exceed 20% each of the cash outflows during these time buckets. If a bank in view of its structural mismatches needs higher limit, it could operate with higher limit with the approval of its Board/Management Committee, giving specific reasons on the need for such higher limit. The objective of RBI is to enforce the tolerance levels strictly by April 1, 2000. 5. In order to enable the banks to monitor their liquidity on a dynamic basis over a time horizon spanning from 1-90 days, an indicative format (Annexure III) is enclosed. The statement of Short-term Dynamic Liquidity should be prepared as on each reporting Friday and put up to the ALCO/Top Management within 2/3 days from the close of the reporting Friday.
6. We advise that in the Statement of Interest Rate Sensitivity (Annexure - II) only rupee assets, liabilities and off-balance sheet positions should be reported. The statement should be prepared as on the last reporting Friday of March/June/September/December and submitted to the ALCO / Top Management within a month from the last reporting Friday. It should also be placed before the bank’s Board in the next meeting. The banks are expected to move over to monthly reporting system by April 1, 2000. The information collected in the statement would provide useful feedback on the interest rate risk faced by the bank and the Top Management/Board would have to formulate corrective measures and devise suitable strategies wherever needed. 7. The guidelines for ALM cover the banks’ operations in domestic currency. In regard to foreign currency risk, banks should follow the instructions contained in Circular AD (MA Series) No.52 dated December 27, 1997 issued by the Exchange Control Department. 8. As regards furnishing of data to RBI, a separate communication will follow from the Department of Banking Supervision. 9. This circular may please be placed before the Board of Directors at its next meeting 10. Please acknowledge receipt. Yours faithfully, (A . Ghosh)
Encl: As above Asset - Liability Management (ALM) System in banks - Guidelines In the normal course, banks are exposed to credit and market risks in view of the asset-liability transformation. With liberalisation in Indian financial markets over the last few years and growing integration of domestic markets and with external markets, the risks associated with banks' operations have become complex and large, requiring strategic management. Banks are now operating in a fairly deregulated environment and are required to determine on their own, interest rates on deposits and advance in both domestic and foreign currencies on a dynamic basis. The interest rates on banks' investments in government and other securities are also now market related. Intense competition for business involving both the assets and liabilities, together with increasing volatility in the domestic interest rates as well as foreign exchange rates, has brought pressure on the management of banks to maintain a good balance among spreads, profitability and long-term viability. Imprudent liquidity management can put banks' earnings and reputation at great risk. These pressures call for structured and comprehensive measures and not just ad hoc action. The Management of banks has to base their business decisions on a dynamic and integrated risk management system and process, driven by corporate strategy. Banks are exposed to several major risks in the course of their business - credit risk, interest rate risk, foreign exchange risk, equity / commodity price risk , liquidity risk and operational risk. It is, therefore, important that banks introduce effective risk management systems that address the issues related to interest rate, currency and liquidity risks. Banks need to address these risks in a structured manner by upgrading their risk management and adopting more comprehensive Asset-Liability Management (ALM) practices than has been done hitherto. ALM, among other functions, is also concerned with risk management and provides a comprehensive and dynamic framework for measuring, monitoring and managing liquidity, interest rate, foreign exchange and equity and commodity price risks of a bank that needs to be closely integrated with the banks' business strategy. It involves assessment of various types of risks and altering the asset-liability portfolio in a dynamic way in order to manage risks. 2. This note lays down broad guidelines in respect of interest rate and liquidity risks management systems in banks which form part of the Asset-Liability Management (ALM) function. The initial focus of the ALM function would be to enforce the risk management discipline viz. managing business after assessing the risks involved. The objective of good risk management systems should be that these systems will evolve into a strategic tool for bank management. 3. The ALM process rests on three pillars:
ALM has to be supported by a management philosophy which clearly specifies the risk policies and tolerance limits. This framework needs to be built on sound methodology with necessary information system as back up. Thus, information is the key to the ALM process. It is, however, recognised that varied business profiles of banks in the public and private sector as well as those of foreign banks do not make the adoption of a uniform ALM System for all banks feasible. There are various methods prevalent world-wide for measuring risks. These range from the simple Gap Statement to extremely sophisticated and data intensive Risk Adjusted Profitability Measurement methods. However, the central element for the entire ALM exercise is the availability of adequate and accurate information with expedience and the existing systems in many Indian banks do not generate information in the manner required for ALM. Collecting accurate data in a timely manner will be the biggest challenge before the banks, particularly those having wide network of branches but lacking full scale computerisation. However, the introduction of base information system for risk measurement and monitoring has to be addressed urgently. As banks are aware, internationally, regulators have prescribed or are in the process of prescribing capital adequacy for market risks. A pre-requisite for this is that banks must have in place an efficient information system. Considering the large network of branches and the lack of (an adequate) support system to collect information required for ALM which analyses information on the basis of residual maturity and behavioural pattern, it will take time for banks in the present state to get the requisite information. The problem of ALM needs to be addressed by following an ABC approach i.e. analysing the behaviour of asset and liability products in the sample branches accounting for significant business and then making rational assumptions about the way in which assets and liabilities would behave in other branches. In respect of foreign exchange, investment portfolio and money market operations, in view of the centralised nature of the functions, it would be much easier to collect reliable information. The data and assumptions can then be refined over time as the bank management gain experience of conducting business within an ALM framework. The spread of computerisation will also help banks in accessing data. 5. ALM Organisation 5.1 a) Successful implementation of the risk management process would require strong commitment on the part of the senior management in the bank, to integrate basic operations and strategic decision making with risk management. The Board should have overall responsibility for management of risks and should decide the risk management policy of the bank and set limits for liquidity, interest rate, foreign exchange and equity price risks. b) The Asset - Liability Committee (ALCO) consisting of the bank's senior management including CEO should be responsible for ensuring adherence to the limits set by the Board as well as for deciding the business strategy of the bank (on the assets and liabilities sides) in line with the bank's budget and decided risk management objectives. c) The ALM Support Groups consisting of operating staff should be responsible for analysing, monitoring and reporting the risk profiles to the ALCO. The staff should also prepare forecasts (simulations) showing the effects of various possible changes in market conditions related to the balance sheet and recommend the action needed to adhere to bank's internal limits. 5.2 The ALCO is a decision making unit responsible for balance sheet planning from risk -return perspective including the strategic management of interest rate and liquidity risks. Each bank will have to decide on the role of its ALCO, its responsibility as also the decisions to be taken by it. The business and risk management strategy of the bank should ensure that the bank operates within the limits / parameters set by the Board. The business issues that an ALCO would consider, inter alia, will include product pricing for both deposits and advances, desired maturity profile and mix of the incremental assets and liabilities, etc. In addition to monitoring the risk levels of the bank, the ALCO should review the results of and progress in implementation of the decisions made in the previous meetings. The ALCO would also articulate the current interest rate view of the bank and base its decisions for future business strategy on this view. In respect of the funding policy, for instance, its responsibility would be to decide on source and mix of liabilities or sale of assets. Towards this end, it will have to develop a view on future direction of interest rate movements and decide on funding mixes between fixed vs floating rate funds, wholesale vs retail deposits, money market vs capital market funding , domestic vs foreign currency funding, etc. Individual banks will have to decide the frequency for holding their ALCO meetings. 5.3 Composition of ALCO The size (number of members) of ALCO would depend on the size of each institution, business mix and organisational complexity. To ensure commitment of the Top Management and timely response to market dynamics, the CEO/CMD or the ED should head the Committee. The Chiefs of Investment, Credit, Resources Management or Planning, Funds Management / Treasury (forex and domestic), International Banking and Economic Research can be members of the Committee. In addition, the Head of the Technology Division should also be an invitee for building up of MIS and related computerisation. Some banks may even have Sub-committees and Support Groups. 5.4 Committee of Directors The Management Committee of the Board or any other Specific Committee constituted by the Board should oversee the implementation of the system and review its functioning periodically. 5.5 ALM Process: The scope of ALM function can be described as follows:
The guidelines given in this note mainly address Liquidity and Interest Rate risks. 6. Liquidity Risk Management 6.1 Measuring and managing liquidity needs are vital for effective operation of commercial banks. By assuring a bank's ability to meet its liabilities as they become due, liquidity management can reduce the probability of an adverse situation developing. The importance of liquidity transcends individual institutions, as liquidity shortfall in one institution can have repercussions on the entire system. Banks management should measure not only the liquidity positions of banks on an ongoing basis but also examine how liquidity requirements are likely to evolve under different assumptions. Experience shows that assets commonly considered as liquid like Government securities and other money market instruments could also become illiquid when the market and players are unidirectional. Therefore liquidity has to be tracked through maturity or cash flow mismatches. For measuring and managing net funding requirements, the use of a maturity ladder and calculation of cumulative surplus or deficit of funds at selected maturity dates is adopted as a standard tool. The format of the Statement of Structural Liquidity is given in Annexure I. 6.2 The Maturity Profile as given in Appendix I could be used for measuring the future cash flows of banks in different time buckets. The time buckets, given the Statutory Reserve cycle of 14 days may be distributed as under:
6.3 The investments in SLR securities and other investments are assumed as illiquid due to lack of depth in the secondary market and are therefore required to be shown under respective maturity buckets, corresponding to the residual maturity. However, some of the banks may be maintaining securities in the 'Trading Book', which are kept distinct from other investments made for complying with the Statutory Reserve requirements and for retaining relationship with customers. Securities held in the 'Trading Book' are subject to certain preconditions like :
Banks which maintain such 'Trading Books' and complying with the above standards are permitted to show the trading securities under 1-14 days, 15-28 days and 29-90 days buckets on the basis of the defeasance periods. The Board/ALCO of the banks should approve the volume, composition, holding/defeasance period, cut loss, etc. of the 'Trading Book' and copy of the policy note thereon should be forwarded to the Department of Banking Supervision, RBI. 6.4 Within each time bucket there could be mismatches depending on cash inflows and outflows. While the mismatches upto one year would be relevant since these provide early warning signals of impending liquidity problems, the main focus should be on the short-term mismatches viz., 1-14 days and 15-28 days. Banks, however, are expected to monitor their cumulative mismatches (running total) across all time buckets by establishing internal prudential limits with the approval of the Board / Management Committee. The mismatches (negative gap) during 1-14 days and 15-28 days in normal course may not exceed 20% of the cash outflows in each time bucket. If a bank in view of its current asset -liability profile and the consequential structural mismatches needs higher tolerance level, it could operate with higher limit sanctioned by its Board / Management Committee giving specific reasons on the need for such higher limit. The discretion to allow a higher tolerance level is intended for a temporary period, i.e. till March 31, 2000. 6.5 The Statement of Structural Liquidity ( Annexure I ) may be prepared by placing all cash inflows and outflows in the maturity ladder according to the expected timing of cash flows. A maturing liability will be a cash outflow while a maturing asset will be a cash inflow. It would also be necessary to take into account the rupee inflows and outflows on account of forex operations. While determining the likely cash inflows / outflows, banks have to make a number of assumptions according to their asset - liability profiles. For instance, Indian banks with large branch network can (on the stability of their deposit base as most deposits are rolled-over) afford to have larger tolerance levels in mismatches in the long-term if their term deposit base is quite high. While determining the tolerance levels the banks may take into account all relevant factors based on their asset-liability base, nature of business, future strategy, etc. The RBI is interested in ensuring that the tolerance levels are determined keeping all necessary factors in view and further refined with experience gained in Liquidity Management.
6.6 In order to enable the banks to monitor their short-term liquidity on a dynamic basis over a time horizon spanning from 1-90 days, banks may estimate their short-term liquidity profiles on the basis of business projections and other commitments for planning purposes. An indicative format ( Annexure III ) for estimating Short-term Dynamic Liquidity is enclosed. 7. Currency Risk
7.1 Floating exchange rate arrangement has brought in its wake pronounced volatility adding a new dimension to the risk profile of banks' balance sheets. The increased capital flows across free economies following deregulation have contributed to increase in the volume of transactions. Large cross border flows together with the volatility has rendered the banks' balance sheets vulnerable to exchange rate movements. 7.2 Dealing in different currencies brings opportunities as also risks. If the liabilities in one currency exceed the level of assets in the same currency, then the currency mismatch can add value or erode value depending upon the currency movements. The simplest way to avoid currency risk is to ensure that mismatches, if any, are reduced to zero or near zero. Banks undertake operations in foreign exchange like accepting deposits, making loans and advances and quoting prices for foreign exchange transactions. Irrespective of the strategies adopted, it may not be possible to eliminate currency mismatches altogether. Besides, some of the institutions may take proprietary trading positions as a conscious business strategy. 7.3 Managing Currency Risk is one more dimension of Asset- Liability Management. Mismatched currency position besides exposing the balance sheet to movements in exchange rate also exposes it to country risk and settlement risk. Ever since the RBI (Exchange Control Department) introduced the concept of end of the day near square position in 1978, banks have been setting up overnight limits and selectively undertaking active day time trading. Following the introduction of "Guidelines for Internal Control over Foreign Exchange Business" in 1981, maturity mismatches (gaps) are also subject to control. Following the recommendations of Expert Group on Foreign Exchange Markets in India (Sodhani Committee) the calculation of exchange position has been redefined and banks have been given the discretion to set up overnight limits linked to maintenance of capital to Risk-Weighted Assets Ratio of 8% of open position limit.
7.4 Presently, the banks are also free to set gap limits with RBI's approval but are required to adopt Value at Risk (VaR) approach to measure the risk associated with forward exposures. Thus the open position limits together with the gap limits form the risk management approach to forex operations. For monitoring such risks banks should follow the instructions contained in Circular A.D (M. A. Series) No.52 dated December 27, 1997 issued by the Exchange Control Department. 8. Interest Rate Risk (IRR) 8.1 The phased deregulation of interest rates and the operational flexibility given to banks in pricing most of the assets and liabilities imply the need for the banking system to hedge the Interest Rate Risk. Interest rate risk is the risk where changes in market interest rates might adversely affect a bank's financial condition. The changes in interest rates affect banks in a larger way. The immediate impact of changes in interest rates is on bank's earnings (i.e. reported profits) by changing its Net Interest Income (NII). A long-term impact of changing interest rates is on bank's Market Value of Equity (MVE) or Net Worth as the economic value of bank's assets, liabilities and off-balance sheet positions get affected due to variation in market interest rates. The interest rate risk when viewed from these two perspectives is known as 'earnings perspective' and 'economic value' perspective, respectively. The risk from the earnings perspective can be measured as changes in the Net Interest Income (NII) or Net Interest Margin (NIM). There are many analytical techniques for measurement and management of Interest Rate Risk. In the context of poor MIS, slow pace of computerisation in banks and the absence of total deregulation, the traditional Gap analysis is considered as a suitable method to measure the Interest Rate Risk in the first place. It is the intention of RBI to move over to the modern techniques of Interest Rate Risk measurement like Duration Gap Analysis, Simulation and Value at Risk over time when banks acquire sufficient expertise and sophistication in acquiring and handling MIS. The Gap or Mismatch risk can be measured by calculating Gaps over different time intervals as at a given date. Gap analysis measures mismatches between rate sensitive liabilities and rate sensitive assets (including off-balance sheet positions). An asset or liability is normally classified as rate sensitive if:
8.2 The Gap Report should be generated by grouping rate sensitive liabilities, assets and off-balance sheet positions into time buckets according to residual maturity or next repricing period, whichever is earlier. The difficult task in Gap analysis is determining rate sensitivity. All investments, advances, deposits, borrowings, purchased funds, etc. that mature/reprice within a specified timeframe are interest rate sensitive. Similarly, any principal repayment of loan is also rate sensitive if the bank expects to receive it within the time horizon. This includes final principal payment and interim instalments. Certain assets and liabilities receive/pay rates that vary with a reference rate. These assets and liabilities are repriced at pre-determined intervals and are rate sensitive at the time of repricing. While the interest rates on term deposits are fixed during their currency, the advances portfolio of the banking system is basically floating. The interest rates on advances could be repriced any number of occasions, corresponding to the changes in PLR. The Gaps may be identified in the following time buckets:
The various items of rate sensitive assets and liabilities and off-balance sheet items may be classified as explained in Appendix - II and the Reporting Format for interest rate sensitive assets and liabilities is given in Annexure II. 8.3 The Gap is the difference between Rate Sensitive Assets (RSA) and Rate Sensitive Liabilities (RSL) for each time bucket. The positive Gap indicates that it has more RSAs than RSLs whereas the negative Gap indicates that it has more RSLs. The Gap reports indicate whether the institution is in a position to benefit from rising interest rates by having a positive Gap (RSA > RSL) or whether it is in a position to benefit from declining interest rates by a negative Gap (RSL > RSA). The Gap can, therefore, be used as a measure of interest rate sensitivity. 8.4 Each bank should set prudential limits on individual Gaps with the approval of the Board/Management Committee. The prudential limits should have a bearing on the Total Assets , Earning Assets or Equity. The banks may work out Earnings at Risk (EaR) or Net Interest Margin (NIM) based on their views on interest rate movements and fix a prudent level with the approval of the Board/Management Committee. 8.5 RBI will also introduce capital adequacy for market risks in due course. 9. General 9.1 The classification of various components of assets and liabilities into different time buckets for preparation of Gap reports (Liquidity and Interest Rate Sensitivity) as indicated in Appendices I & II is the benchmark. Banks which are better equipped to reasonably estimate the behavioural pattern, embedded options, rolls-in and rolls-out, etc of various components of assets and liabilities on the basis of past data / empirical studies could classify them in the appropriate time buckets, subject to approval from the ALCO / Board. A copy of the note approved by the ALCO / Board may be sent to the Department of Banking Supervision. 9.2 The present framework does not capture the impact of embedded options, i.e. the customers exercising their options (premature closure of deposits and prepayment of loans and advances) on the liquidity and interest rate risks profile of banks. The magnitude of embedded option risk at times of volatility in market interest rates is quite substantial. Banks should therefore evolve suitable mechanism, supported by empirical studies and behavioural analysis to estimate the future behaviour of assets, liabilities and off-balance sheet items to changes in market variables and estimate the embedded options. 9.3 A scientifically evolved internal transfer pricing model by assigning values on the basis of current market rates to funds provided and funds used is an important component for effective implementation of ALM System. The transfer price mechanism can enhance the management of margin i.e. lending or credit spread, the funding or liability spread and mismatch spread. It also helps centralising interest rate risk at one place which facilitate effective control and management of interest rate risk. A well defined transfer pricing system also provide a rational framework for pricing of assets and liabilities. APPENDIX – IMaturity Profile – Liquidity
B. Inflows
Note : (i) Liability on account of event cash flows i.e. short fall in CRR balance on reporting Fridays, wage settlement, capital expenditure, etc. which are known to the banks and any other contingency may be shown under respective maturity buckets. (ii) All overdue liabilities may be placed in the 1-14 days bucket.(iii) Interest and instalments from advances and investments, which are overdue for less than one month may be placed in over 3-6 months, bucket. Further, interest and instalments due (before classification as NPAs) may be placed in over 6-12 months bucket without the grace period of one month if the earlier receivables remain uncollected.
D. Financing of Gap : In case the negative gap exceeds the prudential limit of 20% of outflows, (1-14 days and 15-28 days) the bank may show by way of a foot note as to how it proposes to finance the gap to bring the mismatch within the prescribed limits. The gap can be financed from market borrowings (call / term), Bills Rediscounting, Repos and deployment of foreign currency resources after conversion into rupees ( unswapped foreign currency funds ), etc.
# Provisions may be netted from the gross investments provided provisions are held security-wise. Otherwise provisions should be shown in over 5 years bucket.
APPENDIX - IIInterest Rate Sensitivity
ANNEXURE - I
* Net of provisions, interest suspense and claims received from ECGC/DICGC. ANNEXURE - IIName of the bank : Statement of Interest Rate Sensitivity as on : (Amounts in Crores of Rupees)
* Excluding provisions for NPAs and investments.
* Amounts to be shown net of provisions, interest suspense and claims received from ECGC/DICGC. ANNEXURE - IIIName of the Bank : Statement of Short-term Dynamic Liquidity as on ……………..
|