212102
Published on February 26, 2026

Minutes of Pre-Bid Meeting - Electrical Works for Renovation of SBS and allied area at Bank’s Main Office Building, Patna

Open

Tender No: RBI/Patna Regional Office/Estate/25/25-26/ET/1046 [Electrical Work for SBS]

A pre-bid meeting on the captioned subject was convened at the Estate Department, Reserve Bank of India, Patna, on February, 24, 2026, at 12:00 PM, to address queries, if any, from the prospective bidders.

2. The queries raised in the pre-bid meeting and clarification given by the Bank are as follows.

Sl. No.Name of the firmVendor QueryClarification provided by the Bank
1M/s Munna KumarAs per Sl No.1 (a) of Work Description column (Page No. 86) not explicitly mention the rotary handle. Is its supply and installation required?According to the technical specifications in Part 1 of the tender, tripping and common operating handles are mandatory on all poles. Therefore, for safety reasons, a rotary handle on the breaker is mandatory and should be considered part of the scope of work. Tenderers have been advised to quote their rates accordingly with the all operating handles and accessories complete in all respect.
2M/s Munna KumarWhat would be appropriate size to be used in the connection between the MCCB and the main bus bar in the electrical panel, cable or bus bar?To ensure the quality and safety standards of the panel, the connection between the MCCB and the main busbar shall be established exclusively through busbars that conform to the load rating of the MCCB.

3. Tenderers must ensure strict compliance with the eligibility criteria and all terms and conditions stipulated in the tender document. Further, bidders are required to be registered on the MSTC portal and must execute the bidding process with utmost care. In the event of any technical issues during the e-tendering process, bidders are advised to coordinate with MSTC support personnel as per the contact details provided in the tender document.

4. All the aforementioned points were duly noted by the representatives of the respective firms, and their full consent was recorded.

Please note: This document (Minutes of the Pre-bid meeting cum Corrigendum) shall form a part of the tender. Hence, it shall be signed and submitted along with the tender by the tenderers. Rest of the terms and conditions and specifications as mentioned in the tender documents shall continue to remain the same. The above amendments/ clarifications are issued for the information of all the intending bidders. The submission of bid by the firm shall be construed to be in conformity to the bid document and amendments/ clarifications given above. In case any vendors have already uploaded their bids to the MSTC portal before issuance of this Minutes of the Pre-bid meeting cum Corrigendum, they are advised to revise their bids and re upload their bids to the MSTC portal.

Regional Director
Reserve Bank of India
Patna


Annexure

Participants of the Pre-Bid Meeting conducted on February 24, 2026

a) List of Bank Officials who attended the meeting:

Sl. No.Name and Designation of the RBI Official
1Shri Sanjeev Kumar, Deputy General Manager
2Shri Manoj Kumar, Assistant General Manager ((Tec-Civil)
3Shri Sanjay Kumar, Manager
4Shri Abhishek Saha, Assistant Manager
5Shri Anshuman Tripathi, Assistant Manager (Tec-Electrical)

b) List of representatives of participating firms:

Sl. No.Name of the RepresentativeName of the Firm
1Shri Munna KumarM/s Munna Kumar
2Shri Subrata BasuM/s Bose Work Industries Pvt. Ltd.

RbiSocialMediaUtility

Install the RBI mobile application and get quick access to the latest news!

Scan the QR code to install our app

RbiWasItHelpfulUtility

Page Last Updated on: April 19, 2023

Was this page helpful?

RbiTtsCommonUtility

PLAYING
LISTEN