back Minutes of Pre-Bid Meeting - Supply, Installation, Testing and Commissioning (SITC) of Flame Retardant (FR) SMF Batteries for 4 X 120 KVA UPS System at RBI, Patna

Published on ഫെബ്രുവരി , 17 2025

Minutes of Pre-Bid Meeting - Supply, Installation, Testing and Commissioning (SITC) of Flame Retardant (FR) SMF Batteries for 4 X 120 KVA UPS System at RBI, Patna

CLOSED

The captioned tender was published on February 03, 2025 through RBI website (https://www.rbi.org.in). In this connection, a ‘Pre-Bid Meeting’ for the captioned tender was held as per schedule at 12:00 PM on February 14, 2025 in ‘DGM Chamber’ 2nd Floor, Estate Department, Reserve Bank of India, Patna. In this regard, Minutes of the Meeting is issued as below details.
The following staff members of RBI and intending bidders were present during the pre-bid meeting:
i) List of participants on behalf of RBI

Sl. No.

Name

      Designation

1.

Shri Sanjeev Kumar

Deputy General Manager

2.

Shri Anand Kumar

Manager

3.

Shri Abhisekh Saha

Assistant Manager                   

4.

Shri Anshuman Tripathi

AM (Tech. Electrical)

5.

Shri Abhinav Pullak

Junior Engineer (Tech. Electrical)


ii) List of representatives of the intended company/firm to participate in the offline Pre- Bid meeting

Sl. No

Name applicant

Name of the firm/company

1.

Shri Ravi S.K. Singh

M/s Raunak Enterprises

2.

Shri Bipin Kumar Singh

OEM-Amara Raja

3.

Shri Imdad Anwar

M/s Bharat Battery Centre

Clarification given in Minutes of meeting:

Sr. No.

Section

 Queries of Firm

Remarks

1.

Checklist under Sl No. 6

Whether the Authorization certificate from OEM needs to be submitted or not.

Valid authorization dealership/ OEM/ Distributers certificate addressed to RBI PATNA should be submitted as per clause 4.0 under Section I of the tender.

2.

Periodical Testing and checking of Batteries under Sl No. 3.8

The firm enquired about periodical monthly testing and sought the details of the same.

Firm needs to carry out monthly testing and checking of all the batteries as per details mentioned in Para 3.8 of the tender.

3.

Liaisoning with AMC UPS Vendor

Whether liaisoning with present UPS AMC vendor needs to be done during the work.

Liaisoning needs to carried out with the present UPS AMC vendor as per para 5 under general instructions. No extra charges need to be paid by the successful vendor for co-ordination purpose.

4.

Section IV – battery rack and cables

Whether battery racks have to be provided and battery interconnection cables needs to be changed or not.

Existing battery racks may be used if it is compatible with the size of proposed model of batteries or else new battery racks have to be provided without any extra cost to the Bank.
Battery interconnection cables needs to be replaced as per Section IV of technical specifications.

5.

Tax invoice for old batteries

Whether tax invoice shall be issued for old batteries or not.

Rebate for old batteries will be adjusted from payable amount. No invoice will be issued.

6.

 

Whether Bank will carry the factory inspection or not regarding Factory Inspection.

Firm will be required to submit all the test certificates as per para 3.7 (a). Factory inspection prior to dispatch may be at the discretion of the Bank.

7.

Electrical License as per page No. 37

Whether Electrical supervisory License/ wireman license is required or not.

Yes, Please refer section V, under Commercial Condition of sl no 15.

8.

EMD/ Bid Security  as per page No. 37

Whether EMD will be submitted through online mode or physically.

EMD will be submitted either DD or through NEFT to RBI Patna. In this regard please refer section II under Instructions of tenderers of sl no 2.8.1.

9.

Insurance clause

Certificates of three (03) different kinds of insurance will be submitted or not.

Yes, Please refer section III under Special Condition of the contract under Insurance clause Para of sl no 6.0.

10.

Section IV of Technical Specification and Approved Make Column

Whether Technical Specification of checklist has to be submitted or not along with Tender document

Yes, Technical Specification of checklist has to be submitted along with Tender document. Please refer section IV under Technical Specification and Approved Make column.

11.

Section IV of Technical Specification and Approved Make Column

Whether minimum specification of each battery will be 120 AH or not.

Vendor may occur Higher capacity of battery also.

The Bank will not be bound to entertain any further query/clarification from any vendor/contractor in future.

Regional Director
Reserve Bank of India
Patna

Statistics-Data Releases-Overview

Data Releases

This Section provides data on various aspects of Indian economy, banking and finance. While the current data defined as data for the past one year is available at the links provided below, researchers may also access data series available in the Database on Indian Economy link available on this page.

Search Results

Category Facet

category

Category Facet

category

RBI-Install-RBI-Content-Global

റിസർവ് ബാങ്ക് ഓഫ് ഇന്ത്യ മൊബൈൽ ആപ്ലിക്കേഷൻ ഇൻസ്റ്റാൾ ചെയ്ത് ഏറ്റവും പുതിയ വാർത്തകളിലേക്ക് വേഗത്തിലുള്ള ആക്സസ് നേടുക!

Scan Your QR code to Install our app

RbiWasItHelpfulUtility

പേജ് അവസാനം അപ്ഡേറ്റ് ചെയ്തത്: മേയ് 07, 2025

ഈ പേജ് സഹായകരമായിരുന്നോ?