Supply, Installation, Testing and Commissioning of 2 X 80 KVA Uninterrupted Power Supply (UPS) System in N+1 Parallel Redundant Mode at Main Office Building, Reserve Bank of India, Bhopal (Date of NIT available: June 26, 2025) - RBI - Reserve Bank of India
Supply, Installation, Testing and Commissioning of 2 X 80 KVA Uninterrupted Power Supply (UPS) System in N+1 Parallel Redundant Mode at Main Office Building, Reserve Bank of India, Bhopal (Date of NIT available: June 26, 2025)
Supply, Installation, Testing and Commissioning of 2 X 80 KVA Uninterrupted Power Supply (UPS) System in N+1 Parallel Redundant Mode at Main Office Building, Reserve Bank of India, Bhopal (Date of NIT available: June 26, 2025)
Reserve Bank of India, Bhopal invites e-Tender from eligible and willing firms Supply, Installation, Testing and Commissioning of 2 X 80 KVA Uninterrupted Power Supply (UPS) System in N+1 Parallel Redundant Mode at Main Office Building, Reserve Bank of India, Bhopal. The work is estimated to cost ₹38.00 lakh (including GST). 2. This is an open tender. Only those firms, who are registered on MSTC portal will be able to take part in the Tender process. The tender document is available on website https://www.mstcecommerce.com/eprocn/ for download. 3. Tender shall be submitted online in two parts. Part–I of the tender will contain the Bank’s standard technical conditions for the proposed work, which must be agreed to by the tenderers. Part–II of the tender will contain Bank’s schedule of quantities and tenderer’s price bid to be submitted online. 4. The firms fulfilling the eligibility criteria and desirous of being considered for award of the work should upload all the required documents at https://www.mstcecommerce.com/eprocn/ on or before July 28, 2025 (10:00 hours). 5. Part–I of the tender will be opened at 11:30 hrs on July 28, 2025 on MSTC website. The timeline of the tender is as follow:
Regional Director |
Data Releases
This Section provides data on various aspects of Indian economy, banking and finance. While the current data defined as data for the past one year is available at the links provided below, researchers may also access data series available in the Database on Indian Economy link available on this page.
Page Last Updated on: July 21, 2025